Deliverable 3.2 “Hybrid system simulation results” released

In WP3 the existing hybrid power plant test rigs at DLR, NETL and UNIGE have been adapted and optimized for further experiments to provide results for the optimization of gas turbine components, operation and control strategies for the real demonstrator in WP4. In addition, the results are used in WP1 for model validation. This work is detailed in Deliverable 3.2 “Hybrid system simulation results” available in the Public Documents, Public Deliverables section of the website.